Why Make to Measure?

  • 3rd June 2016
  • News
No Comments
A14 M1 Junction

FastFlow bridge drainage product is made to measure to suit the actual structure. The reasons for this are….

  • To match exactly the flow rate requirements of the structure to the unit size.
  • Because every structure is different be it gradient, length, width or geographical area, with so many variants how can a standard size fit all.
  • To prevent debris build up due to an oversize unit being installed.
  • To prevent flooding due to an undersized unit being installed.
  • To match the road surfacing depth with the unit channel depth saving the contractor time and money by eliminating expensive build up materials and labour.

Having a made to measure solution costs nothing extra but can potentially save thousands of pounds in reduced installation costs and reduced maintenance costs.

Have a made to measure solution and avoid the kerb side flower pot scenario by installing the correctly matched sized unit on the structure.

FastFlow Installation Step 1

 

Subscribe to our Newsletter

Recent Tweets

Fast Flow

Hi All, I'm looking to recruit a graduate in to business development and an old school machinist. please share. lnkd.in/dcihr2F

More from our blog

See all posts
No Comments
 

Leave a Comment