In 2006 FastFlow bridge drainage system was installed on the main concourse at Stansted Airport. Nine years on and the drainage system is still performing as installed. The heavily trafficked area is subject to Buses and other vehicles constantly mounting the kerb edge. The units have as expected withstood these heavy impacts and the integrity of the kerb line and the drainage has been maintained. The units are among the largest in the FastFlow range are fully accredited and exceed the D400 loading requirements. More evidence that by installing the strongest and highest capacity unit on the market the client will ensure long life and a trouble free drainage system that will continue to perform well in to the future.