Fowler and Holden Ltd are proud to have supplied the recently opened Bedale bypass. The specially made start and end units were made bespoke for the structure to finish the drainage line and blend to the surfacing. Another project supplied with Type I D400 FastFlow bridge drainage that will remove the surface and subsurface water helping keep road users safe in bad weather. The product remains compliant to D400 when installed with black top up the front and up the back of the unit. Alternatively standard concrete, crushed stone or earth verge can be used at the rear. FastFlow is the only UK manufactured product that can claim compliance to D400 at the point of purchase and that doesn’t require specific installation instruction to be followed. This makes the build cost effective whilst remaining compliant when using FastFlow.